Innovations

 


Machine Shop

     • Size: 195,000 Sq. Ft./18,000 m²
     • 3 Large Drilling Machines for components up to 5 t
          • 9 Machining Centers
       • Annual Capacity:
                                                                             190,000 Production Hours


Welding Shop

     • Size: 12,000 Sq. Ft./1,100 m²
     • 2 Sub-Arc-Welding Machines for components up to      7t
     • 2 Plasma-Arc Welding Machines
     • 1 Orbital-Welding Machine
     • 1 Welding Robot for Hard-Facing
     • 5 Manual Welding Stations (GMAW, GTAW,       SMAW)
       • 7 Furnaces (gas- and electric fired furnaces, shaft      furnaces)
     • Annual Capacity:
       23,000 Working Hours


Assembly

     • Size:
       Assembly: 8,800 Sq. Ft./816 m²
       Clean Condition Room: 2,300 Sq. Ft./216 m²
     • Test Facility: up to a nominal size of 1.2 m and                                                                              an overall length of 3 m valves are pressure and
       tightness tested before leaving the factory
     • Annual Capacity:
                 20,000 Valves